Five-Year Plans

Five Year Plan - 2020-2022

2. Construction of a scheme drain from Battali Khayaghat to Chowrasta.

12. Construction of road from Mostara shop to Chowdhury house.

2. Construction of a bridge over the canal of Sardar Dewarampur.

2. Nesting from the bot tree to the Munshi house.

2. Residents repair the road from the Mullah house to the Surungchail.

2. Construction of road up to the bridge of Eidgah, east of Telisai.

2. Road construction from Telisha's Shame house to Doa house.

2. Repair of the road leading to Telisai from the mother of the Sonachou paved rasa.

2. Construction of Box Kalwat on the side of East Para Bepari house of Funisai.

2. Box Kalvat is constructed next to the house of Fonisir Chirgazi.

2. Deep tube wells installed in front of Fonisir Nayan's house.

12. Deep tube wells installed in front of the Muncie house in Fonisir.

2. Repair of road leading to Wapda road from the house of Subidpur Mukbul Member.

2. The mass market is being built in Subidpur Ideal Market.

2. Drain kalwat is constructed on the south side of the Subidpur School.

2. Subidpur Munshi without the house, to re-build the road up to the house.

2. A. Deep tube wells installed in front of Lakshpur glass house.

2. A. Deep tube wells installed in front of Bakhia house.

2. A. Establishment of solar palace on the banks of Lakshpur Dighi.

26. Establishment of solar panels at Lakshpur Chowrasta Street.

26. The construction of the guide wall on the pond of the pond of the house.

22. The grounds of Lakshpur Sarakari Primary School are filled.

26. Deep tube wells installed in front of Rosa Bepari house in Lakshpur.

26. Deep tube wells installed at Mantala da Sarda house.

26. Development of a mosque in the Montala Kazi house.

Five Year Anniversary Plan - 2020-2023

2. Kalawat of the scheme in front of the Dharampur da Patwari house.

12. Box Kalwat in front of the Uvarampur Kathari home.

2. Roads leading from Badal Munshi's house to Mullah's house.

2. Nesting boxes are constructed in front of the house.

2. Telcai's Muncie house is building a box culvert on the north side.

2. Box Kalvat Construction on the side of Telisari Mizi house.

2. Construction of Ghatla on the foot of Nuraani Madrasa Pond at Telisai.

2. The road from Funesir to paved road to Zamdar house is reconstructed.

2. Box Cultivators are constructed in front of the three-story house of Fonisir.

2. Deep Nalakpur set up at Akram Ali Munshi house in Subidpur.

2. Establishment of the Sameen Solar Street Line in Subidpur Molla house.

12. A. From Lakshpur Bhuiyan house to the mosque house, the moving CC is cast.

12. From the Haji house to the middle of the house, the box is built.

2. Construction of Box Calvat on the side of Dr. Lakshpur Ruhul Amin house.

2. Road repair from Mizla to West Mizi house.

Five Year Plan - 20-2021

2. Road repair from Munshibari to the tower from Boharampur.

12. Road repair from Berampur Bepari house to Batala Khayaghat.

2. Residents repair the road from the house of Ganara to Sadra.

2. Box dwellings are constructed on the north side of the dwelling Molla house.

2. Construction of guide wall on Telisai Mosque house pond.

2. Guide wall erected on the pond of the house of Telisai Zakir Member.

2. Provide deep tube-wells at Subidpur Union Health Center at No.7.

2. Construction of public toilets in front of the Central Jama Masjid of Funisir.

2. Sahid Minar and Almari of Subidpur Government Primary School.

2. Box Kalvat is being constructed in front of the Eidgaon house of Subidpur.

2. Repair of road from Sendra road to Jamdar house.

12. Road repair from Anand Bazar to Lakshpur to old house.

2. Road repair from Jakmatla to Lakshpur to Amin Master's house.

2. Road repair from the west Meiji house to the East Meiji house.

Five Year Plan - 20-25

2. Box Kalwat construction in front of Hazara house in Dorarampur.

12. Delivery of Ehizin boxes to students from 1st to 8th grades of Dharampur Girls High School.

2. Installation of Solar Home System at Dharampur Girls High School.

2. Residents erected deep tube wells in front of Medina Bazaar.

2. From the West Residential Primary School, the road leading to the house of Zafar Sahib is cast.

2. Construction of mass storage with tanks on the east side of the house shop at Telisai Vaid.

2. Construction of guide wall at Telisai Primary School Pond.

2. UP Complex Toilet Sanitary Fittings Completed

2. Provide 1 ceiling fan, 2 ballballs, 2 soccer and 3 harmoniums at Fonisir Primary School.

2. Deep tube wells installed in front of Bagpur Government Primary School.

2. Box Kalwat is being constructed next to the North Subidpur Barkandaj home.

12. Drain and kalwat construction next to Subidpur school.

2. The construction of drain culvert from the Subidpur Molla house to the Wapda canal.

2. Construction of RCC Ghatla at Jama Masjid at Chowrasta Jama Masjid in North Lakshpur.

2. Road construction from North Lakeshpur Baitul Falah Jama Masjid to Jamdar house.

2. Re-construction of road leading from shop to house of shopkeeper from Lakshpur chakidar house.

2. Providing various testing equipment, 3 chairs, 3 tables and medicine racks at the Montala Community Clinic.


Five Year Plan - 20-25

2. Solar installation at mosque of Patrawari Bhavarampur.

12. Surungchail Howlada house is constructed by Kalwat.

2. The homes supply primary school furniture.

2. Construction of the Solar of the Mosque of Noah's house in Telisi.

2. From Lakeshpur intersection to Telisai, cross the road.

2. Eidgaon repairs by Funisir.